A new MUEG site for the utilisation of mineral waste has been opened at the Penig connection point, conveniently situated adjacent to the A72 motorway. This has helped increase our capacities to transport these materials from the region of Chemnitz and its surrounding area. In accordance with the allocation value Z2 of the joint working committee of the German Federation and the federal states (LAGA), mineral waste is intended for integration in the subsoil to make soil reusable as a technical structure.