We have gypsum, gravel, crushed stone – and ideas

Building waste:
Disposal and recycling

The treatment and utilisation of suitable construction waste to obtain secondary and landfill construction material is another important part of our company's service portfolio. Thanks to our treatment, utilisation and composting plants at various sites in Saxony and Saxony-Anhalt, we provide full regional coverage in terms of reliable disposal security.

Our company sites in Halle Lochau and in the south of Leipzig boast train terminals, so we are able to act as a partner for disposal solutions beyond the borders of our region and can quickly and effectively accept large quantities of mineral construction waste materials. Depending on the quality of the construction waste delivered to us, we recycle these materials in our treatment plants to obtain secondary and landfill construction materials. Furthermore, we are able to obtain recycled products from gypsum waste. This product is then re-introduced into the material cycle.

Fast, effective and sustainable – 
We recycle for you:

The treatment and material utilisation of suitable construction and demolition waste to obtain secondary and landfill construction material is another important part of our company's service portfolio. Thanks to the dedicated train terminal at our company site in Halle Lochau, we are able to act as a partner for disposal solutions beyond the borders of our region and can quickly and effectively accept large quantities of mineral construction waste materials.

 

With our treatment, utilisation and composting plants at various sites in Saxony and Saxony-Anhalt, we provide full and reliable coverage in terms of disposal security

 

Acceptance and delivery of materials

Please call ahead:

To save yourself time and trouble when delivering waste materials to one of our sites, please contact our sales representatives beforehand.

This enables us to clarify swiftly if the material meets the acceptance requirements and limit values and corresponds to our company’s process instructions applicable at the site.

This enables us to clarify swiftly if the material meets the acceptance requirements and limit values and corresponds to our company’s process instructions applicable at the site. We accept the following construction waste and organic waste materials for disposal or utilisation in our treatment, recycling and composting plants at our locations in VEZ 1 Großpösna, Schkopau-Lochau and Delitzsch Südwest:

  • Building rubbish
  • Soils
  • Garden and green cuttings
  • Municipal sewage sludge

What happens with the waste materials?

Umweltpreis Awards 2015: MUEG among the finalists

References

  • Major construction site for the new Löwitz Quartier Leipzig (disposal of mineral construction and demolition waste)
  • Major construction site at Leipzig Flößenhöfe
  • Major construction site at Leipzig Alte Hauptpost
  • Major construction site at Halle (Saale) Holzplatz
  • Disposal from the construction sites of Deutsche Bahn AG through framework agreement.
  • Remediation / recultivation of slopes: Vergissmeinnicht pit, Nottagebau surface mining Ammendorf, Espenhain screen wall