Overview for 2026: Challenges for the future

The new year brings exciting challenges for the future development of our company, which we want to master together. These include:

We are planning to expand our production capacities for recycled gypsum in Germany. By specifically developing new locations, we are contributing to increasing the recycling of gypsum-containing waste while also strengthening our position as a raw material supplier for the gypsum processing industry.

Expansion of recycling options for mineral wool waste at the MUEG site in Beuna. We now offer our customers the option of delivering non-hazardous mineral wool waste for material recycling. Please coordinate the acceptance qualities with us.

Expansion of rail operations at the A 72 highway interchange – upgrading of the track at the MUEG site VEZ II Espenhain. With the new rail connection, we are laying the foundation for intermodal operations. The combination of road and rail is perfect for sustainable logistics solutions, reduces CO₂ emissions, and increases transport efficiency.

Recycling of railway superstructure materials at the MUEG site in Lochau. As a framework agreement partner of Deutsche Bahn, we offer the acceptance and disposal of railway superstructure materials at the Lochau site via the existing rail connection. The processing of these materials into high-quality secondary raw materials for track construction, the concrete industry, and use in earthworks, road construction, and path construction is an integral part of the expansion and further development of our site.

Certification of green waste RAL quality compost. In accordance with RAL quality assurance requirements, another quality-tested product is offered at the MUEG site in Asendorf.

If you are interested, please contact us.